Please use this identifier to cite or link to this item: http://hdl.handle.net/2445/106845
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorChamarro Aguilera, María Esther-
dc.contributor.advisorNavarro Palacín, Mònica-
dc.contributor.authorCosta Criado, Xènia-
dc.date.accessioned2017-02-13T10:08:31Z-
dc.date.available2017-02-13T10:08:31Z-
dc.date.issued2017-01-
dc.identifier.urihttp://hdl.handle.net/2445/106845-
dc.descriptionTreballs Finals de Grau d'Enginyeria Química, Facultat de Química, Universitat de Barcelona, Curs: 2016-2017, Tutor: Esther Chamarro Aguilera, Mònica Navarro Palacínca
dc.description.abstractA company is using tap water previously demineralised for their productive process. Now, is considering the possibility of demineralize the water from the wastewater treatment plant (WWTP), that is currently spilt onto the sewage system (SS), and the water from two wells and use them in the process in order to reduce the consumption of tap water and the cost the use of it involves. The aim of this project is to plan the closing of the water cycle (production-WWPT-production) and verify if it’s profitable, which means, check if the initial investment will be amortized and, what’s more if the project will suppose an economic saving in a long-term. This project has been realised taking in account the only two premises that the company has imposed. The first one is the initial investment of the project has to be minimum and the second is the new installation has to require the minimum maintenance and attention of plant’s operators. According to these premises, the process designed for achieve the aim of the project consists on a vessel, a filter and a pump. Finally, the initial investment of 25,000 € is returned in 2.5 years and the company will save 11,000 € per yearca
dc.format.extent64 p.-
dc.format.mimetypeapplication/pdf-
dc.language.isoengca
dc.rightscc-by-nc-nd (c) Costa, 2017-
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/es/-
dc.sourceTreballs Finals de Grau (TFG) - Enginyeria Química-
dc.subject.classificationPlantes de tractament d'aigües residualscat
dc.subject.classificationOsmosicat
dc.subject.classificationTreballs de fi de graucat
dc.subject.otherSewage disposal planteng
dc.subject.otherOsmosiseng
dc.subject.otherBachelor's theseseng
dc.titleClosing of the plant’s water cycle; using water from the wastewater treatment plant and wells for the osmosis processeng
dc.title.alternativeTancament del cicle de l’aigua; us d’aigua provinent de la planta depuradora i de pous subterranis en la planta d’osmosica
dc.typeinfo:eu-repo/semantics/bachelorThesisca
dc.rights.accessRightsinfo:eu-repo/semantics/openAccessca
Appears in Collections:Treballs Finals de Grau (TFG) - Enginyeria Química

Files in This Item:
File Description SizeFormat 
COSTA CRIADO, XENIA 2016-2017 T .pdf1.58 MBAdobe PDFView/Open


This item is licensed under a Creative Commons License Creative Commons